Brent Bertrand
VP, Division Manager
3901 S. Lamar, Ste. 300
Austin, Texas 78704
512-443-4848
- HVAC Piping
- Plumbing
- HVAC Sheetmetal Fabrication & Installation
- Skid Fabrication
- Equipment Rigging/Installation
- Sheetmetal and Ductwork Fabrication
- Class 100 Clean-room for Electronics grade fabrication
- Hygienic Fabrication for the bio-pharm industry
- Stainless Steel (Orbital & TIG)
- Poly-pro, PVDF and PVC
- Carbon Steel Fabrication (isolated from Stainless work)
- Copper (Silver Solder)
- Skid Fabrication
Our branch is staffed to provide complex conceptual budget estimating as well as detailed quantity surveys.
DSI's experienced field employees are capable of providing various levels of startup assistance and commissioning support services dependent upon the specific requirements of each individual project.
Dynamic Systems was incorporated in 1988 in Austin, Texas. Propelled by the rapid growth of the technology industries in Austin the organization prospered and formed the nucleus for national growth. In Austin Dynamic Systems has a significant pool of talent and resources supporting a diverse market.
Austin
- 475,000 square feet hospital with 170 beds
- Full-Service pediatric hospital incorporates innovative
design elements and leading edge technology including:
- three-acre fully landscaped Healing Garden
- state-of-the-art surgical suites
- First Hospital in the world to have Platinum Status under the LEED Program
|
 |
Austin
- 32 story, 800-room convention center hotel with 100 residential units, 2 ballrooms, retail and office areas utilizing
- Austin Energy's district cooling supply water
- 4 levels of below grade ventilated parking
- Guest rooms utilize vertically stacked 2 pipe fan coils with electric heat
- High rise mechanical provisions include stair pressurization, smoke exhaust and floor pressurization
|
 |
Austin
- 3 story, 880,000 SF office building space
- Under floor air highways for open office air conditioning
- Multi-zone air units serve the interior and perimeter areas of the buildings
- Each building was constructed in 9 months
|
 |
Austin
- 3 story, 159,000 SF patient tower, ICU and Surgery Department
- Improvements to Infrastructure to support growth including:
- central plant
- chillers
- generators
- Future capacity for 4 additional stories to the patient tower and future capacity for more medical / surgical beds
|
 |
Austin
- 51,000 sq. ft. addition with the new surgical suites, recovery areas and day surgery support
- Expansion and renovation of the emergency room will increase its potential capacity by 31 percent
- Surgery capacity increased by 40 percent as part of this project that included 26 operating rooms
- Renovation of the existing surgical suites and surrounding support services
|
|
Austin
- Expansion at St. David's Medical Center Women's Center is where nearly 5,000 babies are delivered annually
- The expansion eventually will allow for 27 more beds in the 53-bed neonatal intensive care unit
- 2 additional labor and delivery rooms
- 7 more post-partum beds
- Also slated for St. David's Medical Center is a helipad
|
 |
|