
Mark Kelly
VP, Division Manager
|

Rick Gopffarth
VP, Business Development Manager
|
|
2683 Lombardy Lane
Dallas, Tx 75220
214-351-7500
- HVAC Piping
- Plumbing
- HVAC Sheetmetal Fabrication & Installation
- Process Piping - High Purity (Electronics Grade)
- Process Piping - Hygienic (Pharmaceutical/Biotech)
- Skid Fabrication
- Equipment Rigging/Installation
- Sheetmetal and Ductwork Fabrication
- Class 100 Clean-room for Electronics grade fabrication
- Hygienic Fabrication for the bio-pharm industry
- Stainless Steel (Orbital & TIG)
- Poly-pro, PVDF and PVC
- Carbon Steel Fabrication (isolated from Stainless work)
- Copper (Silver Solder)
- Skid Fabrication
Our branch is staffed to provide complex conceptual budget estimating as well as detailed quantity surveys.
DSI's experienced field employees are capable of providing various levels of startup assistance and commissioning support services dependent upon the specific requirements of each individual project.
Dynamic Systems, Inc. opened the Dallas / Ft. Worth office and fabrication facilities in 1988. The office was originally set up to support Dallas / Ft. Worth based semiconductor companies but over the last decade has developed into one of the largest "full scale" mechanical contractors in the Metroplex. The Dallas / Ft. Worth branch provides full mechanical services, including HVAC Piping, Plumbing, Sheet metal Fabrication and Installation, High Purity Piping, Process Piping and Skid Manufacturing.
|
- Air Liquide America Corporation
- Air Products
- Alcon Laboratories
- Atmel
- Austin Commercial, L.P.
- Beck
- Centex Construction
- DFW Airport
- DPR Construction, Inc.
- General Motors
- Globitech
|
- Halliburton
- Hunt Construction Group
- Lockwood Greene Engineers
- Maxim Semiconductor
- McCarthy
- MEMC Microelectronics
- Peterbilt Motors
- S.T. Microelectronics
- Southern Methodist University
- Texas Instruments
- Triquint Semiconductor
|
Dallas/Ft. Worth
- 2 million sq. ft., world class International Terminal D
- Labeled the "Crown Jewel" of Dallas / Ft. Worth's Capital Development program
- Equipped with 29 wide-body swing gates
- 3 level roadway system
- Capable of handling 32,000 passengers daily or 11.7 million passengers annually
- Features 99 ticketing positions and a federal inspection facility capable of processing 2,800 passengers per hour
- The concession areas consist of 100,000 sq. ft. and features upscale shopping and fine dining
- An arrivals canopy shields pedestrians from inclement weather as they enter and exit the terminal
- A Grand Hyatt Hotel and garage is integrated into the terminal
- The new 8 level parking garage has 8,100 parking spaces and use a Smart Technology System that lets guests know which floors are full
- Air-conditioned sky bridges with moving walkways and elevators make the walk from the garage to the terminal easy and comfortable
- In addition to construction management, DSI also fabricated and installed much of the project systems
|


 |
Dallas/Ft. Worth
- Covers nearly 304,000 sq. ft.
- Offers 17,100 sq. ft. of ballrooms, banquet rooms and conference facilities
- Mechanical / Plumbing Prime Contractor for the Hotel Project
- Special security features are part of the construction and design
- Extending vertically are 8 levels of guest rooms, topped by a rooftop swimming pool and spa
- Custom bathrooms feature glass-enclosed showers and separate tubs with black granite tile used for floors, counters and tub-surrounds
|
 |
Dallas/Ft. Worth
- The first designed LEED Platinum speculative office building in the United States
- 3 story, 61,000 sq. ft., facility will be leased to tenants
- Projected to reduce energy use by over 60 percent from a similar, conventional office building
- Raised flooring with under floor air distribution for good indoor air quality and flexibility for tenants
- Photovoltaic panels as a renewable energy source to reduce pollution
- Energy Efficient Ground Source Heat Pump System with geo-thermal wells for mechanical efficiencies
- Capabilities to capture and clean site storm water run-off to improve water quality and minimize negative impacts related to storm water management
- Rain water cisterns to store roof rain-water to reduce potable water required for irrigation
|
 |
Richardson, Texas
- 1,000,000 s.f., 300mm Semiconductor Fabrication Facility
- 220,000 sq. ft. Cleanroom
- Mechanical Systems Installed:
- DI Water Distribution
- Acid, Solvent and General Exhaust Systems
- Process Cooling Water Distribution
- Specialty Gas Rooms & Piping Distribution
- Subfab Interstitial Steel System
|
 |
Dallas/Ft. Worth
- 3 story, 105,000 sq. ft. science building with offices, labs and auditorium space
- Remote mechanical plant with redundancy (shares services to adjacent Science Research Building)
- Mechanical systems include:
- full service HVAC installation with 2 operational AHU's and a 3rd installed for future use
- stainless steel lab exhaust (served by 4 fume hood fans)
- glass piping waste systems
- bulk, specialty gas and DI Water distribution systems
|
 |
Dallas/Ft. Worth
- 10 story, 300-room resort hotel with a 50,000 sq. ft. conference center
- Vertically stacked 2 pipe fan coils with electric heat
- Pre-treated guest room outside air
- Kitchen and laundry exhaust systems
- High rise mechanical provisions include stair pressurization, smoke exhaust and floor pressurization
|
 |
|