SOP's Vendor qualifications
Specification review
Equipment Inspections
Material Inspections
Welder qualifications
Weld Inspections
FAT
SAT
ETOP's
FDA System validation |
UHP operating procedures
Vendor Audits
UHP material inspections
UHP weld procedures
Weld Inspections
UHP gas system Testing: moisture, oxygen, THC and Particle analysis and Helium Leak Detection
UP Water systems testing
Cleanroom Certifications |
Specification Review
Building Systems Commissioning
Equipment Inspections
Track Medical Gas System Installation
Duct System Inspections
HVAC Duct System Testing
Piping Systems Testing
Start up Assistance |
Dynamic Systems, Inc. Quality Assurance program has been
developed to ensure our clients the highest quality level of materials
and workmanship consistent with the project specification and the
requirements for customer's expectations. The success of the program
is achieved through a combination of on-site quality verifications,
off site fabrication quality verifications, quality checklists,
inspections, expediting procedures and appropriate reporting.
- Quality Assurance Program: established to provide a level of standards and production procedures to control fabrication and installation and ensure that installations completed by Dynamic Systems, Inc. conform to quality requirements
- Establish Procedures: fabrication shops, job-site installations for all phases of our work
- Vendor Qualifications: periodic audits for verification that vendors are providing what is specified
- Specification & Submittal Review: to verify that specified materials and equipment are being purchased according to the contract
- Equipment & Material Inspections: as items are received on-site
- Plumbing Licenses & Medical Gas Installers Endorsements: tracked for all employees and a project specific data base maintained
- Welder Qualifications & Weld Inspections: WPS, PQR and WPQ for shops and job-site
- Final Testing & Pre-Commissioning Tasks: Duct Pressurization Testing, Piping Systems Testing, Medical Gas Systems Qualifications, Insulation Inspections and complete systems inspections
- Manufacturer's Compliance: verification of equipment tagging, documentation, protection during shipping, O & M manuals
- Pre-Commissioning: functional testing of components, equipment and complete systems
- Start up checklist: operational testing of completed systems
- Systems Acceptance Testing: documented by system and sub-system
|